[640x512] [1280x1024]
Front left view during renovation, Dec '01. Original plaster has been stripped from concrete piers
Viewed: 898 times.
|
[640x512] [1280x1024]
Interior view, Dec '01. Scaffolding is erected to provide access to the high ceiling.
Viewed: 973 times.
|
[512x640] [1024x1280]
Altar view during renovation. Terazzo stepped motif of reredos is covered to protect it during ceiling renovation
Viewed: 987 times.
|